Business connectivity built for cloud comms
Ethernet leased lines, FTTP full fibre, SoGEA, SD-WAN and 4G/5G failover. Multi-carrier coverage from Openreach, CityFibre, Virgin Media Business and TalkTalk Business, managed end to end and ready for the 2027 PSTN switch-off.

Two ways to get to the right connectivity
Not sure what you need? Answer five quick questions. Know your postcode? Check availability - both take under a minute.
Not sure which service you need?
Answer five quick questions and we'll suggest the right tier - then check it's available at your postcode.
Check connectivity at your premises
Real-time pricing and availability across Openreach, CityFibre, Virgin Media Business, Colt and Neos Networks.
The full connectivity range at a glance
Filter by product family and click through to a deep-dive on any circuit type.
- Telappliant FibreCoreBroadbandSpeed80 Mbps - 1.8 GbpsContention8:1Best forSmall offices stepping up from FTTC.SLANext business dayLearn
- Telappliant FibreLightBroadbandSpeed100 Mbps - 5 Gbps symmetricContention8:1, 20% guaranteedBest forCloud-first offices on Teams / hosted voice.SLANext business dayLearn
- Telappliant FibreLight PlusBroadbandSpeed100 Mbps - 5 Gbps symmetricContention8:1, 20% guaranteedBest forFibreLight with 24/7 support + DDoS.SLA24/7, enhancedLearn
- Telappliant FibreBrightEthernetSpeed100 Mbps - 10 Gbps symmetricContentionUncontended (1:1)Best forHead offices, contact centres, critical sites.SLA24/7, 5hr fixLearn
- SoGEABroadbandSpeedUp to 80/20 MbpsContentionSharedBest forSites without FTTP yet, PSTN-ready.SLANext business dayLearn
- Point-to-Point / Dark FibreEthernetSpeedUp to 100 GbpsContentionUncontendedBest forCampus, site-to-DC and DR interconnects.SLA24/7, 5hr fix
- SD-WAN OverlayOverlaySpeedDepends on linksContentionn/aBest forMulti-site, mixed circuit estates.SLAManaged 24/7Learn
- 4G and 5G FailoverBackupSpeedUp to 500 MbpsContentionSharedBest forAlways-on backup, rapid deployment.SLA24/7 monitoredLearn
- Proactive Monitoring & QoSOverlaySpeed24/7 NOCContentionn/aBest forAny site running hosted voice or Teams.SLAIncluded
Why businesses route their connectivity through us
One partner for the circuit, the router and the cloud comms running over it.
Openreach, CityFibre, Virgin Media Business and TalkTalk Business - best tech at each postcode.
99.9% uptime on Ethernet, 5-hour target fix, enhanced care on broadband where you need it.
QoS end to end so hosted phones and Teams stay clear at peak load.
Every recommendation is built for the January 2027 switch-off, so you are not left on an FTTC-plus-line dead end.
Our NOC sees jitter, packet loss and outages before your users do.
One bill, one helpdesk, one engineer owning the circuit and everything on it.
Common use cases
Voice-grade quality for Teams calling
Pair Ethernet with FTTP or SoGEA backup so Teams and hosted voice stay clear under load.
Preparing for the 2027 PSTN switch-off
Retire FTTC + analogue estates by moving sites to SoGEA or FTTP with no service gap.
Rapid deployment for temporary sites
5G routers bring construction offices, pop-ups and events online within 24 hours.
Multi-site at scale
Standardise FTTP, leased lines and SD-WAN across HQ, branches and warehouses on one contract.
Switching from your current provider
Nobody changes circuit provider for fun. This is how a change runs without a day of downtime in the middle of it.
- 01
Availability, not assumptions
We run every site against Openreach, CityFibre, Virgin Media Business and TalkTalk Business, so the recommendation reflects what can actually be delivered at that postcode.
- 02
Order and install alongside the live line
SoGEA and FTTP typically land in 10 to 15 working days. Ethernet runs 30 to 90 working days where wayleaves or civil works are involved. Your existing circuit stays up throughout.
- 03
Configure, then test under load
Router, firewall handoff, QoS marking for voice and any SD-WAN policy are configured and tested before anything moves.
- 04
Cut over, then monitor
We switch traffic in an agreed window and the NOC watches jitter, packet loss and availability from day one.
Check the notice period and any remaining term on your existing circuit before you order. Early termination charges stay with your current provider.
Who does what on the circuit
We handle
- Carrier selection, ordering and install project management
- Wayleave chasing and site survey coordination on Ethernet builds
- Router or SD-WAN configuration and QoS for voice traffic
- 24/7 NOC monitoring, fault raising and carrier escalation
- One bill and one helpdesk for the circuit and the services over it
You handle
- Site access for surveys and installation
- Landlord permission where a wayleave is needed
- Notice and any early termination charge on the existing circuit
- Internal cabling and power at the demarcation point
Short reads that save budget
Three explainers that answer the questions we get asked most, before you commit to a circuit.
FTTP vs leased line
When contention matters, when it doesn't, and how to pick without overspending.
ReadWhat SD-WAN actually solves
The three problems it fixes and the three it doesn't, in plain English.
ReadPSTN switch-off in 2027
What to do about FTTC + analogue lines before they stop working.
ReadCommon questions
Related services
Talk to us about connectivity
A short call, no obligation. We'll run availability for every site.